An eCRF design checklist should connect each collected data item to a protocol objective, participant-safety need, operational requirement or analysis use. The goal is complete, interpretable data with minimum unnecessary site burden.
Checklist: controls and supporting evidence
Begin with the most consequential control and the evidence needed to resolve it. The following matrix connects each decision to records and an accountable action, rather than treating the list as a generic compliance checkbox.
| Control / question | Evidence to examine | Sponsor action |
|---|---|---|
| Purpose and provenance | Endpoint, assessment and authoritative source for each field | Remove redundant items lacking purpose |
| Visit/logic fit | Schedules, cohort branches, repeating forms and windows | Confirm real subject journeys |
| Field usability | Labels, units, ranges, choices, missing reasons and skip logic | Prevent ambiguous responses |
| Safety and exceptions | AE/SAE, pregnancy, withdrawal, dose changes | Make exceptional paths captureable |
| Analysis and review | SAP linkage, edit checks, coding and UAT cases | Ensure downstream datasets are feasible |
For teams that need support implementing this across functions, BioBoston CRO eCRF Design and Review can help adapt the controls to the study, vendors, and decision calendar.
Working through the controls
1. Purpose and provenance
Evidence: Endpoint, assessment and authoritative source for each field. Decision: Remove redundant items lacking purpose. Record the responsible function and the approved source version, and keep any remaining exceptions visible to the sponsor before this item is closed.
2. Visit/logic fit
Evidence: Schedules, cohort branches, repeating forms and windows. Decision: Confirm real subject journeys. Record the responsible function and the approved source version, and keep any remaining exceptions visible to the sponsor before this item is closed.
3. Field usability
Evidence: Labels, units, ranges, choices, missing reasons and skip logic. Decision: Prevent ambiguous responses. Record the responsible function and the approved source version, and keep any remaining exceptions visible to the sponsor before this item is closed.
4. Safety and exceptions
Evidence: AE/SAE, pregnancy, withdrawal, dose changes. Decision: Make exceptional paths captureable. Record the responsible function and the approved source version, and keep any remaining exceptions visible to the sponsor before this item is closed.
5. Analysis and review
Evidence: SAP linkage, edit checks, coding and UAT cases. Decision: Ensure downstream datasets are feasible. Record the responsible function and the approved source version, and keep any remaining exceptions visible to the sponsor before this item is closed.
Red flags that should change the plan
- Collecting every possible data point.
- Hidden mandatory fields block urgent safety records.
- Free text where controlled terminology is essential.
Decision gate and governance
For every field, ask who uses it, when it is entered, what source supports it and how an error would be detected. The control owner should record the decision, evidence version, date, residual uncertainty and next re-review trigger. Where delegated providers perform the work, the sponsor should retain the relevant oversight and acceptance evidence.
Regulatory note: Determine which electronic records and signatures are regulated before applying 21 CFR Part 11 controls; FDA guidance supports risk- and intended-use-based implementation.
Need practical support?
Use BioBoston CRO eCRF Design and Review to review the evidence, define decision rights, and build a study-specific action plan for the next milestone.


