Home > Clinical Data Management > EDC Build and Database Design

EDC BUILD AND DATABASE DESIGN SERVICES

EDC Database Build Services and Clinical Database Design

BioBoston CRO provides EDC database build services and clinical database design support for sponsors that need a study-specific Electronic Data Capture environment configured from approved protocol, eCRF, standards, data-flow, user, security, integration, testing, and release requirements. Support can include build specifications, database configuration, edit checks, roles, integrations, user acceptance testing, validation documentation, change control, or independent build review.

Global Reach

100 %

Therapeutic Area Coverage

100 %

Years of Experience

25 +

START A CONVERSATION

Tell Us What Support You Need

Select the support you need and share a few details about your project. We’ll use this information to route your inquiry to the appropriate BioBoston team member.


Please do not submit confidential, patient-identifiable, or proprietary information through this form.

Best fit for this support

The engagement should be scoped around the current state of the work, the intended decision or milestone, the source package, and the sponsor's approval responsibilities.

Sponsors building a new study database

Connect protocol requirements, eCRFs, data standards, edit checks, coding, integrations, roles, reports, exports, testing, and release controls.

Teams independently reviewing a CRO or vendor build

Assess configuration against approved requirements, forms, data flow, validation evidence, defects, user acceptance testing, and production-readiness criteria.

Studies recovering a delayed or unstable database

Identify requirement, design, configuration, integration, testing, defect, ownership, and schedule causes before resetting the release plan.

When you may need EDC Build and Database Design support

when needed

Problems this service helps address

Problems

The service is most valuable when the team can identify the specific control gap, decision, deliverable, or
recovery need rather than requesting generic capacity.

Scope of support

Scope

The exact scope depends on the maturity of the work, the quality of the inputs, the sponsor’s procedures,
the review model, and the target milestone.

Typical deliverables

Deliverables

Deliverables should be confirmed at kickoff and linked to defined sponsor decisions, review cycles, and downstream handoffs.

Client inputs that help the work move efficiently

Client inputs

The sponsor does not need every detail finalized before kickoff, but approved decisions, open questions, source owners, reviewers, and deadlines must be distinguishable.

How the engagement works

Process

1. Confirm the purpose, current state, intended use, milestone, stakeholders, responsibilities, systems or vendors, and agreed deliverables. .

2. Review available source materials, prior decisions, procedures, evidence, and open issues; issue a focused gap and dependency list.

3. Develop the work plan, specifications, document, assessment, or control package included in scope.

4. Coordinate review through named sponsor and cross-functional decision owners and maintain a controlled open-item and comment process.

5. Perform the agreed technical, quality, consistency, or operational checks and document remaining risks or limitations.

6. Prepare the approved handoff, implementation, submission, remediation, archive, or next-step package as defined in scope.

Quality, regulatory, and operational considerations

Considerations

The work should remain proportionate to the risk and intended use, follow the sponsor’s controlled process, and preserve clear sponsor decision authority.

Engagement options

Engagement options

Complete work package

BioBoston leads the defined scope from assessment and planning through drafting or execution, review, quality control, and handoff.

Targeted module or rescue

BioBoston addresses a specific section, decision, backlog, finding, vendor issue, or stalled deliverable without expanding the engagement unnecessarily.

Independent review or sponsor-side support

BioBoston provides an objective second-line review, oversight role, or embedded specialist while the sponsor or another vendor retains primary execution.

Related BioBoston services

RELATED SERVICES

eCRF Design and Review

Define the form structure, fields, response options, instructions, annotations, and usability before configuration.

Data Management Plan Review

Establish the study data-management operating model, responsibilities, standards, cleaning, reconciliation, lock, and archive requirements.

EDC Vendor Qualification

Confirm vendor and platform suitability, validation evidence, security, service, and sponsor reliance before build.

Biostatistics

Align data structure, derivations, analysis variables, timing, and exports with the Statistical Analysis Plan and reporting needs.

Match the expertise to the project

Expertise

EDC-build experience should match the selected platform, study design, protocol complexity, data standards, edit-check and coding model, integrations, validation approach, regions, and release timeline.

Related resources

RESOURCES

Explore the following resources for additional insights and information relevant to this service.

EDC Database Build Readiness Checklist

A planned checklist for protocol, eCRFs, requirements, standards, roles, integrations, edit checks, testing, access, release, and change control.

Clinical Database UAT Template

A planned set of risk-based scenarios for forms, visits, roles, edit checks, queries, calculations, workflows, integrations, reports, exports, and defects.

Protocol Amendment Database Impact Checklist

A planned tool for requirements, forms, fields, visits, checks, integrations, reports, test cases, data migration, training, and release.

Frequently asked questions

FAQs

What is included in EDC database build services?

Scope may include requirements, design, configuration, forms and fields, visit structure, codelists, roles, workflows, edit checks, reports, exports, integrations, testing, defects, traceability, release, and controlled changes.

Specific platform capability must be confirmed before scope. The assigned resource should have relevant system experience, and access, licenses, vendor controls, and environment responsibilities must be defined.

The workstreams are connected but have separate intent. eCRF Design defines what should be captured
and how the form should work; EDC Build configures and tests that approved design in the selected
system.

Yes. Independent review can assess requirements, design, configuration, traceability, testing, defects,
access, integrations, release evidence, and alignment with protocol and eCRFs.

Yes. Support may include UAT strategy, scenarios, scripts, test data, execution or review, defect triage, retesting, regression, evidence, and release recommendations.

No. Validation provides evidence that the configured database performs as intended within scope. Data quality also depends on source data, site conduct, users, external systems, review, queries, and ongoing controls.

Tell Us About Your EDC Build

PROJECT FORM

Share the study, selected EDC, protocol and eCRF status, integrations, current build stage, validation model, target release date, and principal risks. A BioBoston team member will review the request and follow up regarding fit and possible next steps.


Please do not submit confidential, patient-identifiable, or proprietary information through this form.

Connect requirements, configuration, testing, and release

A productive first discussion identifies the protocol, forms, standards, platform, integrations, current build, defects, validation expectations, owners, and target release. BioBoston can then define the build, review, UAT, validation, or rescue scope.